11. This is not Grand Designs
Following on from planning permission, Hesketh Hayden developed the detailed design and specification of the EcoBungalow ready for costing by the builder, Alex Burn of 4Site Engineering & Construction. With spiralling inflation, the costs came back significantly over budget. We got together for a strategy meeting: how could we get this project back on track? I said at the meeting: ‘This is not Grand Designs. I’m not going over budget. And I’m NOT having a baby’ (For the unini
suerowlands47
Mar 1, 20232 min read